CHALLENGE
To provide shading solutions for this world class facility that addresses multiple needs and challenges. The multi-use design of the facility requires solutions for research labs, conferencing and meeting spaces, presentation areas, administration areas, etc. These solutions need to meet the performance criteria of the space today, while remaining cost free to maintain and provide ongoing value as the facility evolves.
ACTION
As a member of their “pre-construction team”, Kay + Sons provided input and innovative options to the architectural and design team while considering construction costs and end user functionality. We also provided important value engineered product and installation solutions during the process.
RESULT
The client will receive state of the art products and systems that enhance the value of the spaces that they are installed in. The contractor and end user benefited from our early involvement as evident by their reduced construction costs relating to redesigned ceiling and wall details. All of the products installed include long term warranties and will contribute to the client’s reduced maintenance and operating costs.